Galindo & Boyd recently Completed the MacArthur Hills Assisted Living Facility in Irving, TX. G&B Installed all
the exterior finishes on a load bearing CFMF structure.
- 45,000 sf of Stucco
- 15,000 sf of Thin Veneer Stone
- 25,000 sf of Hardie Board Siding & Trims
- Along with Waterproofing, flashings and misc. hardscape masonry.
This is the Galindo & Boyd difference; complete exterior scope – 1 contractor!!! Learn More